What is the process of installing roller shutters?
Roller shutters are a brilliant way of improving your building in a number of ways. Having them installed will enhance security, energy efficiency, noise reduction and even make the exterior of your premises look more aesthetically appealing.
If you would like to know more about the installation process then this blog is for you.
In this latest blog, we cover the following as part of the roller shutter installation process:
- Initial site surveys
- Pre-installation preparation
- Installation Processes
- Training and handovers
- Post installation support
Following reading this, if you’d like further information or help with getting the process started then get in touch with our experts here at UK Doors and Shutters and we will be delighted to help.
Simply call us on 01204 918991 or make use of the contact form.
Let's get into the process of installing roller shutters...
1.) Initial Survey & Quotation
We first need to come and take a look at your site location to get a feel for your environment and assess some specific requirements. This will make it way easier for us to evaluate some key factors including:
- Measurements: Accurate measurements of doors, windows, or other openings to ensure a perfect fit for your roller shutter, whether that being a manual or electric shutter.
- Material Choice: We will also provide recommendations on materials such as aluminum or steel, depending on the property's security needs.
- Operation Type: Discussion of manual or electric operation, including smart automation options. Electric shutters are the go-to option in the modern-day era for many businesses.
- Aesthetic Preferences: Colour and design preferences to complement your property's exterior.
2.) Pre-Installation Preparation
Once the customer approves the quote, pre-installation preparations commence. This stage ensures the property is ready for a seamless installation process.
Key steps include:
- Custom Manufacturing and Selection: Roller shutters are custom-built or bespoke ordered based on the precise measurements and material choices.
- Site Preparation: The installation team arranges a convenient date and advises on clearing the installation area.
- Safety Checks: Ensuring the installation site complies with safety standards, especially if electrical wiring is involved.
3.) Comprehensive Installation
This is where the fun begins and you will get sight of your new roller shutters.
The actual installation is carried out by our experienced engineers and typically involves the following steps:
- Mounting the Guide Rails: Securely fixing the guide rails on either side of the opening to guide the shutter.
- Installing the Shutter Box: Positioning and securing the shutter box, which houses the roller mechanism.
- Fitting the Curtain: Inserting the shutter curtain into the guide rails and attaching it to the roller tube.
- Electrical Connections: For electric shutters, connecting the motor to the power supply and installing control switches or remote systems.
- Operational Testing: Testing the shutter's operation to ensure it opens and closes smoothly without obstructions.
The installation duration varies depending on the size and number of shutters but generally completes within a few hours to a day. We will provide a more accurate timing estimate on the day of installation.
4.) Training and Handover
Some systems are more complicated than others so we will always give you a run down on how to use it and how to maintain it properly. These steps include:
- Operating Controls: Demonstrating how to operate switches, remote controls, or smart systems.
- Manual Override: Explaining how to manually operate the shutters in case of a power outage.
- Safety Features: Highlighting safety mechanisms.
5.) Post-Installation Support
Quality roller shutter providers such as ourselves will always offer ongoing support to maintain the product's performance and longevity.
Post-installation services typically include:
- Annual Servicing: Regular maintenance checks to ensure smooth operation and address wear and tear. We can arrange a routine maintenance package with you if you wish to continue using UK Doors and Shutters.
- Emergency Repairs: Prompt response for any operational issues or accidental damage. We have a 24/7 repairs service so we’ll provide all the details of this moving forward.
- Warranty Coverage: Coverage for repairs or replacements as per the manufacturer's warranty terms.
- Upgrades and Modifications: Opportunities to upgrade control systems or integrate smart features in the future will also be presented to you after the installation stage.
Contact UK Doors & Shutters
This blog aimed to provide a detailed idea of what the roller shutter installation process looks like.
The guide is pretty standard however there may be variations along the way depending on your project requirements.
If you would like more information or a FREE quote then don’t hesitate to contact the UK Doors and Shutters team today!
UK Doors & Shutters are available any time you need us to please call 01204 918991 or use the contact form on our website for the speediest response times.
We look forward to installing your brand new roller shutters at your property soon!